This post is for information and discussion of the Bones 5.5 Pledge Manager only.

 

This is the current status of Bones 5.5:

  • The system to place additional or new orders has been disabled.
  • Orders have been reviewed.
  • All purchase orders with the vendors we use in China have been placed.
  • Deposits ensuring the beginning of production have been made.
  • We've been told that production will commence before the start of Chinese New Year and will be completed after the
  • Chinese New Year. For those not aware of how Chinese New Year works, the country closes all types of businesses for 4-6 weeks. In the case of one of our vendors, their factory will be closed the last week of January and will reopen after the first week of March.
  • We expect updated shipping and production information after the end of Chinese New Year.
  • Our next email update will be in March.
  • Like 2
Link to comment
Share on other sites

  • Replies 155
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

6 hours ago, Dillsticks said:

Any updates...  it's March and there is another kickstarter soon...

 


Production is still ongoing now that Chinese New Year is over. One of the factories had like 50% of their workforce out sick with Covid about 2 weeks ago. 
 

Ed has claimed on the last 2 Reaper Lives that he’d send out an update the next day, but it’s Ed, and he never gets to it. 

  • Thanks 3
  • Sad 1
Link to comment
Share on other sites

I'm not worried about it yet. Is it nice to have stuff by the expected delivery date? Yes. Does that happen? Not often.   Will Reaper deliver? Yes. 

 

I wish I could remember what I ordered.  I don't remember what email I used for the "2nd account".  

 

  • Like 1
  • Haha 1
Link to comment
Share on other sites

  • Super Administrators
2 hours ago, ksbsnowowl said:


Production is still ongoing now that Chinese New Year is over. One of the factories had like 50% of their workforce out sick with Covid about 2 weeks ago. 
 

Ed has claimed on the last 2 Reaper Lives that he’d send out an update the next day, but it’s Ed, and he never gets to it. 

I have reminded him this morning. 🙂 So we should hopefully see something soon. 

 

  • Like 2
  • Thanks 3
Link to comment
Share on other sites

The email from March 23 estimated everything would be packed by June 30th. 
__________________
 

I think that (packed) means in a container (or several) buttoned up and ready to roll away from the factory (on June 30).
 

8 Steps after that are:

Roll to a Chinese container terminal (port).

Load onto a container ship. 
Container ship transits Pacific Ocean from port (Shenzen?) to Panama. 
Ship transits Panama Canal. 
Ship transits Gulf of Mexico to Houston. 
Unloads at Houston TX. 
Customs. 
Rolls by either truck or rail or both to Denton. 

Edited by TGP
Link to comment
Share on other sites

  • Super Administrators

5.5 Update - 3

 

Greetings all, Ed here.

I need to apologize first, as the last update was written and sent to be emailed and then lost in the works.

Where we left off was getting a shipping schedule together. Below you will find the actual reply messages we received from each of the two vendors concerning the production time frame.

Currently we are planning to take the shipments through the Panama Canal and unload in Houston Tx. This adds to the shipping charge but should allow faster transit to us once unloaded. 

Please understand that the Omicron surge currently ravaging China and Hong Kong is not over, and as with all things, times could slip.

 

Vendor 1 

Hi Ed and the Reaper team,

 

I trust you are all doing well, but the situation in China is getting worse due to the Omicron pandemic. In Dongguan, where over 50% of the world’s toys are produced and our factory is situated has been locked today to March 21, 2022. No production nor logistic activities are allowed and so we have no choice but to shut down our production. The labor shortage situation has been improving but this shutdown will derange our production planning’s. I hope we can resume production on March 22, but I really don’t know. Some orders will be delayed but we will do our best to keep the ship date we promised. We will do the best we can.

 I will update you as soon as I have more information. Thank you for your understanding. Take care!

 

(Vendor 1’s Production and shipment schedule is the same as Vendor 2’s schedule below.)

 

Vendor 2

Hi Ed, Hi Ron,

Hope this email finds you well.

Here are the estimated timelines for the two projects for reference:

Bones 5 reorder: 

Mass production: March 22nd--May 10th

     Assembly:        April 25th--May 20th

    Inspection:       May 10th--May 30th

      Packing:         May 30th--June 30th


I want to thank all of you for your support. If you have a question, do not hesitate to email us. [email protected].

  • Like 3
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...